Asignat
Add your banner here ($9.00/week)
uHYIPs.com - Unique HYIP monitor system, HYIP rating. Personal HYIP monitor pages with your referral links for FREE!
All HYIPs | New HYIPs | Diamond | Platinum | On Hold | Users HYIP Rating | Blacklist

Sign in

members area

Search HYIP's

type your query

Payment

systems
Perfectmoney
Perfectmoney

Payeer
Payeer

ePayCore
ePayCore

Bitcoin
Bitcoin

Litecoin
Litecoin

Ethereum
Ethereum

Bitcoin Cash
Bitcoin Cash

Dogecoin
Dogecoin

Dash
Dash

Tron
Tron

Ripple
Ripple

Monero
Monero

Zcash
Zcash

Ether Classic
Ether Classic

Stellar
Stellar

Bitcoin SV
Bitcoin SV

Neo
Neo

Waves
Waves

Cardano
Cardano

Dai
Dai

Binance Coin BEP20
Binance Coin BEP20

Binance Coin BEP2
Binance Coin BEP2

Bitcoin BEP20
Bitcoin BEP20

Binance USD ERC20
Binance USD ERC20

Binance USD BEP20
Binance USD BEP20

Binance USD BEP2
Binance USD BEP2

Tether Omni
Tether Omni

Tether ERC20
Tether ERC20

Tether TRC20
Tether TRC20

Tether BEP20
Tether BEP20

PayPal
PayPal

YandexMoney
YandexMoney

WebMoney
WebMoney

AdvCash
AdvCash

NixMoney
NixMoney

QIWI
QIWI

InterKassa
InterKassa

CreditCard
CreditCard

Bankwire
Bankwire

Skrill
Skrill

Neteller
Neteller

Counters

Independent statistics
Statistics of uHYIPs.com



Electrical Ventures Limited - HYIP details

Electrical Ventures Limited

Status uHYIPs: NOT PAYING
lifetime: 2958 days
monitoring: 2955 days
Investment of uHYIPs: $100
Payout ratio for uHYIPs: 138%
User's investments: $0
Payout ratio: 0%
uHYIPs Rating: 0
User's rating: 0 (1 vote)
Min deposit: $1
Max deposit: $1000
Withdrawal: Manual
Referral: 6%
Discussion: MMGP | DTM
Contacts:
Investment plans:
5%-8% Daily for 20 days, principal included
PM BTC
We have been investing in the development of energy-saving technologies in the field of "green" energy (hydro, wind, geothermal and solar power plants and equipment for them). Electrical Ventures Ltd is one of the contractors on the construction being built in China's largest hydroelectric power plant "Three Gorges", our specialists are involved in the construction of floating power plants in the reservoir Yamakura Dam (Japan) and supervised several major projects in the Netherlands and the Arctic Circle. Now we invite you to join our professional team and promote this useful direction with us.
Last payouts:
Type User Date Amount
Payout uHYIPs 28 Mar,2016 $8.71
Status uHYIPs: Not Paying

Comments and votes for Electrical Ventures Limited


Add your vote / comment for Electrical Ventures Limited:

Excellent +0.3 points if the program regulary pays you.
Good +0.1 points if you are satisfied with the program.
Info 0.00 points if you want to share some info about the program.
Bad -0.1 points if you have some problems with the program.
Awful -0.3 points if program not paying you.
Comment:
Your name:  Your email:
Type image code:      

Votes:
Posted by min from Netherlands on 18 Mar,2016. IP: 213.152.*.*, E-mail: m***s@yandex.by
nice